Qingdao Xinguangzheng Xinyuan Construction Engineering Co., Ltd.

Focus on customer satisfaction, provide high quality steel structure buildings

Manufacturer from China
Verified Supplier
2 Years
Home / Products / Pre Engineered Building /

Wide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Contact Now
Qingdao Xinguangzheng Xinyuan Construction Engineering Co., Ltd.
Visit Website
City:qingdao
Province/State:shandong
Country/Region:china
Contact Person:MrsDella
Contact Now

Wide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Ask Latest Price
Video Channel
Brand Name :XGZ
Model Number :XGZ-PEB004
Certification :CE EN1090,ISO9001
Place of Origin :Pingdu,Qingdao
MOQ :100 square meters
Price :USD 40-100 per square meter/Negotiable
Payment Terms :T/T, L/C, Western Union, MoneyGram
Supply Ability :15000 tons per month
Delivery Time :30-55 days
Packaging Details :Steel pallet or in bulk
Name :Pre-engineered Building
Application :Steel Fabricated Building, Warehouse, Workshop
Keyword :Steel Structure Pre-engineered Building
Main frame :Welded H-shape Steel Beam, Column
Surface Treatment :Anti-rust Paint, Hot Dip GaLvanized
Size :Customization Size
Standard :GB
Installation :Engineers Guidance
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Wide Span Steel Structure Pre-Engineered Building For Warehouse Workshop

Product Description


Pre-engineered steel building systems are professionally engineered structures that provide cost-effective and efficient buildings. All major steel building system will be need CAD tools to custom design each building system and all building components depending on the customers' needs and specifications and on the local and national building codes. The basic elements of the pre-engineered building system include primary rigid frames, secondary members such as wall girts and roof purlins, cladding and bracing. These elements are engineered and designed to act as an integrated building system. The primary rigid frames are typically designed and constructed in accordance with steel structure design standards.
Pre-engineered steel building systems are used in almost every conceivable application. You will find them in industrial applications such as complex production workshops, warehouses and distribution centers. They are used in office buildings, shopping centers, supermarkets, airplane hangars. They are also used in schools, government buildings.

Product Parameters


The selection principle of steels for prefab steel pre-engineered building
The principle of steels selection is not only to make the structure safe and reliable and meet the requirements of use, but also to save material and reduce cost. In order to ensure the bearing capacity of the bearing structure and prevent the brittle failure that may occur under certain conditions, the following factors should be considered comprehensively: the importance of the structure, the nature of the load, the connection method, the working environment of the structure, and the thickness of the steels.

Items Specification
Main Steel Frame Column Q235, Q355 Welded H Section Steel
Beam Q235, Q355 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee brace Q235 Angle Steel
Tie rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Vertical&Horizontal support Q235 Angle Steel, Round Bar or Steel Pipe
Cladding system Roof panel Sandwich Panel, Steel Sheet
Wall panel Sandwich Panel, Steel Sheet
Accessories Window Aluminium Alloy Window, PVC Window
Door Sliding Sandwich Panel Door, Rolling Metal Door
Rainspout PVC

Wide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Features of Pre-engineered Building


The steel structure has numerous advantages over the traditional concrete building:

1. Environmental friendly, most of the excess material can be 100% recycled

2. Lower cost and maintenance

3. Fast construction and easy installation, time saving and labor saving

4. Good appearance

5. Stable and earthquake resistance, wind resistance, sound insulation

Wide Span Pre Engineered Building Anti rust Pre Fab Steel BuildingsWide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Application


Applications of steel structure pre-engineered building:
Whatever your application, our team of skilled structural engineers will design and engineer cost effective building systems. Below are some of pre-engineered steel structure buildings applications:
- Industrial Buildings
- Warehouses
- Aircraft Hangars
- Showrooms
- Super Markets, shopping mall
- Office Buildings
- Dairy Farms
- Workshops
- Poultry House
- Steel Shed
- Storage

Wide Span Pre Engineered Building Anti rust Pre Fab Steel BuildingsWide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Wide Span Pre Engineered Building Anti rust Pre Fab Steel BuildingsWide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Design and Quote


If you already have the project drawings, we can quote directly for you. If you do not have drawings, we can also design for you, our professional technical team to help your ideas into reality, after you confirm the design before quotation.

Basic design requirements:

1. Project site location;
2. Overall dimension (length*width*eave height);
3. Mezzanine or not? How many kgs of load per square meter on mezzanine?
4. Single-layer steel sheet wall or sandwich panel wall;
5. Snow load if applicable;
6. Wind speed/load;
7. Interior column allowed or not;
8. Overhead crane needed or not, capacity?
9. Any other particular requirements?

Wide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Product Processing


After the construction drawing is confirmed by the customer and the technician makes the 3D model, then will enter the factory processing stage, which mainly has the following steps:

1. Cutting
Steel components, such as beams, columns, and plates, are precisely cut to the required dimensions using advanced cutting techniques, such as Automatic laser cutting machine, to ensure accurate fitment during assembly.
2. Assemble
The cut steel pieces are fitted together according to engineering drawings and specifications.
3. Welding
Welders employ various welding techniques, to join the steel components securely. Welding creates strong and resilient connections, enhancing load-bearing capacity.
4. Rust removal
Before surface treatment, any rust or scale on the steel surfaces must be removed. Techniques like sandblasting, shot blasting, or chemical cleaning are used to eliminate corrosion, creating a clean and smooth surface.
5. Surface treatment
Spray painting or hot-dip galvanizing according to customer's requirements, so that the surface is not corroded.

Wide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Quality Inspection


Xinguangzheng has passed CE as well as ISO9001 and other related certifications. Moreover, we have professional inspection personnel to carry out a series of quality checks from raw material purchase until the goods are shipped to ensure the quality of the finished products.

Wide Span Pre Engineered Building Anti rust Pre Fab Steel BuildingsWide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Wide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

Customers Visit


Xinguangzheng warmly welcomes you to visit our company. Here, you will see that our six workshops and several production lines are operating at the same time, and the output is guaranteed. You will also see our technicians explain your project ideas and we will design a unique building for you. Of course, you can come at any time during the project, including before delivery you are welcome to inspect the goods. Welcome again!

Wide Span Pre Engineered Building Anti rust Pre Fab Steel Buildings

FAQ


1. Are you factory?

Yes, our factory produce and sell steel structures many years. We have a lot of experience at the steel building manufacturing area.

2. How can I get the quotation of the project?

If you have drawing, we can offer quotation accordingly. If you don't have design, we will design some drawings for your confirmation, and then offer quotation.

3. Do you offer service for installation?

We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need.

4. Do you accept container loading inspection?

You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

5. How long does it take to get my building?

Lead time is vary, but typically 2 weeks of drawings and 30-55 days for delivery(depending on complexity).

Inquiry Cart 0