Qingdao Xinguangzheng Xinyuan Construction Engineering Co., Ltd.

Focus on customer satisfaction, provide high quality steel structure buildings

Manufacturer from China
Verified Supplier
2 Years
Home / Products / Steel Shed /

Q235 Q355B Steel Structure Shed Hot Dip Galvanized Painted

Contact Now
Qingdao Xinguangzheng Xinyuan Construction Engineering Co., Ltd.
Visit Website
City:qingdao
Province/State:shandong
Country/Region:china
Contact Person:MrsDella
Contact Now

Q235 Q355B Steel Structure Shed Hot Dip Galvanized Painted

Ask Latest Price
Video Channel
Brand Name :XGZ
Model Number :XGZ-SS002
Certification :CE EN1090,ISO9001
Place of Origin :Qingdao,China
MOQ :100 square meters
Price :USD 30-100 per square meter/Negotiable
Payment Terms :T/T, L/C, Western Union, MoneyGram
Supply Ability :15000 tons per month
Delivery Time :30-55 days
Packaging Details :Steel pallet
Name :Steel Shed
Processing Service :Bending, Welding, Decoiling, Cutting, Punching
Application Fields :Steel Shed,Warehouse,Workshop
Main frame :Q235, Q355B Carbon Steel
Keyword :Steel Shed
Design Softwares :PKPM,Auto CAD,3D3S,Tekla,SAP2000
Surface Treatment :Hot Dip Galvanized,Painted
Life span :50 Years
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Fully Customizable Steel Shed For Various Application Structural Steel Building

Product Description

The sheds of steel structures mainly refers to the main bearing members are composed of columns, beams, anchor bolts, roof frames, roof and wall.Compared with other structures such as concrete structures, wood and stone structures, steel structures has the advantages of high strength, good plasticity and toughness, light weight, uniform material and so on, so it has been widely used in the field of architecture and rapid development.

Product Parameter

The steel sheds are fully customized, and all specifications and parameters are designed according to the specific requirements of our customers. From the size and layout to the materials used, every aspect of steel sheds is carefully crafted to meet the individual demands of our clients. Our team works closely with customers to ensure that their vision is translated into a functional and high-quality product.

Name Steel Shed
Main Structure Column Q355,Q235B Welded or Hot Rolled H- steel , Box column is also available
Beam Q355,Q235B Welded or Hot Rolled H- steel
Surface Processing Options 1. Epoxy Zinc-Rich Primer + Epoxy Mica Intermediate Paint (120μm thickness)
2. Hot Dip Galvanization
Sub Structure Purlin Q355B C/Z Section Steel
Angle Brace Q235B L- Steel
Cross Bracing Q235B Round Bar, L-Steel
Tie Bar Q235B Round Pipe
Batter Brace Q235B Round Bar
Roof System Roof Panel Options 1. Insulated Sandwich Panel, PU, Rock Wool, Glass Fiber, EPS. Thickness of Roof Panel 50mm/75mm/100mm
2. Steel Plate, Thickness 0.4mm/0.5mm/mm
Gutter Options 1. Galvanized Steel Gutter, Thickness 2.0mm/2.5mm, 3.0mm
2. Painted, Pre-finished Steel Gutter, Thickness 0.4mm/0.5mm/0.6mm
Down spout PVC Pipe
Wall System Wall Panel Options 1. Insulated Sandwich Panel, PU, Rock Wool, Glass Fiber, EPS. Thickness of Roof Panel 50mm/75mm/100mm
2. Steel Plate, Thickness 0.4mm/0.5mm/mm
3. Brick Wall (provided by client)
Door 1. Roller Door, Size Customized
2. Sliding Door, Size Customized
3. Access Door, Steel Door, Glass Door etc.
Window PVC or Aluminum Frame, Fixed, Swing, Sliding etc, Size Customized
Accessories and Fasteners Anchor Bolts, Chemical Bolts, High Strength Bolts, Ordinary Bolts, Self-Drilling Screws, Rivet etc.

Q235 Q355B Steel Structure Shed Hot Dip Galvanized Painted

Connection mode

According to the different connection methods, it can be divided into welding structure and bolt connection structure.
Welding connection is the most important method of steel structure connection at present, its advantages are simple structure, save material, easy processing, and can adopt automatic operation.
Bolt connection is also a common connection method, assembly is convenient, rapid advantages. Can be used in structural mounting connection or detachable structure. The disadvantage is that the section of the component is weakened and easy to loosen.

Q235 Q355B Steel Structure Shed Hot Dip Galvanized Painted

Why choose steel shed buildings?

Steel structures have superior performance and are substitutes for traditional concrete structures. Compared with traditional concrete, it has three characteristics of "high, large and light", and are easy to realize design standardization, structural parts production industrialization, construction mechanization and assembly.
In addition, it has the following superior performance characteristics:
1. Light weight, only about 30%~50% of the traditional reinforced concrete buildings, and the strength is high;
2. The steel structures occupies a small area, the space utilization rate is high;
3. Good ductility and superior seismic performance;
4. The steel structures construction efficiency is high, can be increased by 4 times, the construction period is short, only one third of the traditional buildings;
5. It also has the advantages of flexible plane layout, green environmental protection, convenient construction and so on.

Installation Process

Installation of prefabricated steel shed:

1. Anchor bolt will be pre embedded according to design drawing: Anchor bolt plan.

When install, it need use template to fix, positional deviation is ±5mm. Screw thread should be protected.
2. Steel column installs according to installation drawing- column plan.

Column foot plate should be welded cycle by continuous welding fillet on site.
3. Floor platform will be according to installation drawing -first floor steel beam plan, second floor steel beam plan.

Column and beam connected part, the plate will be welded in site; Welding joint bottom will be welded with plate.
4. Roof beam will be according to installation drawing- Roof beam plan.

Oblique beams should be welded cycle by continuous welding fillet on site.
5. Roof purlin, steel stair and decking floor will be installed according to installation drawing.

Diamond plate, decking floor and stair joint of stair transfer platform can be cut according to the site installation.
6. Pay attention to length when install the gutter.

Water funnel will be parallel with wall.

Q235 Q355B Steel Structure Shed Hot Dip Galvanized Painted

Q235 Q355B Steel Structure Shed Hot Dip Galvanized Painted

We provide comprehensive steel structure installation guidance tailored to your needs. Our services include sending construction drawings, installation videos, and online instructions. We can also dispatch our skilled construction personnel to your country for on-site installation support.

Packing and Shipping

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
1. The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

2. At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

3. Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

4. No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

5. The member to the construction site, timely organization of unloading, stacking area.

6. The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

Q235 Q355B Steel Structure Shed Hot Dip Galvanized Painted

FAQ

1. What kind of company you are?

We are steel structure building Manufacturer located in Qingdao China. We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism.

2. Is your price competitive compared to other companies?

We will do everything, we can to reduce your cost and guarantee you get the best product that you paid for.

3. Can you send engineers or whole team to install my project?

We will give detailed installation drawings and video for free. We can send engineers as installation director or a team upon request.

4. Do you offer designing service for us?

Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc.

5. What is the delivery time?

Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30-55 days after receiving the deposit.

Inquiry Cart 0